Version 10.0.0.20190903 | Hotfix release | Sep 03, 2019

Business scenario Description VSTS ID Version
Workspace On the project tasks workspace, Timesheet records are not getting filtered properly on My missing timesheet form. Now with this fix My timesheets tile count and the records on the form is correctly displayed. 43484 10.0.0.20190903
AR aging On Contract open invoices form, Amount were summing up considering the Customer ID for records without Invoice number. Now with this fix, Transactions will not be customer ID and Transaction line will display the same amount as same as “Amount open” on each transaction line. 48598 10.0.0.20190903
Resource data entity Few issues related to Resource data entity is fixed and working now 54853/54854/54855/54856/54857 10.0.0.20190903
Resource data entity Now, through Resource forecast data entity, user can import planned resources also. 54858 10.0.0.20190903

Changes to Resourcing functionality (VSTS ID– 58414)

In order to significantly improve performance of the Projects360 (Projects+) resourcing screens, a reliance on Microsoft classes and summary table (ResRollup) have been deprecated. With this updated release, new classes have been added to populate the booking (ResBooking) table using optimized logic for the Projects360 forms. As part of the design changes, the capacity logic is based on the Projects360 Target utilization feature along with the Resource booking table. These changes are compatible with existing users of the Projects360 Resourcing functionality, but do somewhat limit the compatibility with standard Microsoft D365FO forms.

Performance:

  • Performance of all booking experiences is significantly improved.

Resource forecast form:

  • Hard book or soft booking button will consider start date and end date with hours per day to book the resource for that duration.
  • Changing the dates at later point of time will not re-fetch booked hours or update booked hours.
  • When the user books the hours through Resource view or Project view forms, all the booked hours including the hours booked beyond the end date mentioned on the resource forecast form will get updated on the Booked hours field.

Resource intelligent form:

  • The Hours available field now considers the Target utilization table to more accurately calculate part time billable Resources. The updated experience considers Target hours for the period minus Booked hours to calculate the Remaining hours. This number of available hours corresponds to the Resource view form.
  • The calculation for matching scores also considers the logic change for Hours available.

Resource view form and Project view form :

  • The booking logic has changed behind the scenes for significantly improved performance.
  • No changes have been made to the user experience.

PTO form:

  • PTO bookings for approved requests are updated to match the logic used in the other forms.



Version Information

Package Name Model Name Version
LearningPlan Learning Plan 10.0.0.20190903
PMIN Projects+ integrations 10.0.0.20190903
ProjAX ProjAX 10.0.0.20190903
ProjAXBI ProjAX BI 10.0.0.20190823
ProjAXIA ProjAX IA 10.0.0.20190903
ProjAXWorkspace ProjAXWorkspace 10.0.0.20190903


Version 10.0.0.20190823 | Hotfix release | Aug 23, 2019

Business scenario Description VSTS ID Version
Invoice archive Invoice archive function includes all the attachments of all the projects. Now with this fix only attachments pertaining to current project is archived. 45650 10.0.0.20190823
Manage pending time Earlier manage pending time data entity used to fetch all the records into the excel. Now with this fix only records pertaining to logged in user is exported into excel, only administrator priviledge will allow to pull in all the records to excel. 44719 10.0.0.20190823
PSA integrations Some of the customer information from PSA wasn’t getting integrated to Dynamics 365 F&O if the field service feature is not enabled. Now with this fix, all the customer information will get integrated to Dynamics 365 F&O if the field service feature is not enabled 55235 10.0.0.20190823
Invoice proposal When the project invoice report is generated and saved as PDF, page number is placed in incorrect position on 2nd page onwards. Now with fix the page number is placed in the right position. 55496 10.0.0.20190823
Personal time off request My PTO requests displays a draft record by default even though if there are no PTO request created by user. Now with this fix, we have addressed this issue and no draft record will created if there is no PTO request is created. 55501 10.0.0.20190823

Version Information

Package Name Model Name Version
LearningPlan Learning Plan 10.0.0.20190823
PMIN Projects+ integrations 10.0.0.20190823
ProjAX ProjAX 10.0.0.20190823
ProjAXBI ProjAX BI 10.0.0.20190823
ProjAXIA ProjAX IA 10.0.0.20190823
ProjAXWorkspace ProjAXWorkspace 10.0.0.20190823


Version 10.0.0.20190802 | Hotfix Release | Aug 02, 2019.

Business scenario Description VSTS ID Version
Auto add to favorites Error triggers when the batch job process run for deletion of favorites available in intercompany. Now with this fix, error does not trigger and the activity will get deleted from ‘All favorites’ form in both the intercompany if activity is in closed status. 55056 10.0.0.20190802
Resourcing On the Resource forecast form, a warning message triggers when user tries to assign resource which is not assigned on the project and when the ‘Resource/project’ validation is set to mandatory. Now with this fix, this validation is skipped and do not adhere to the ‘Resource/project’ validation. 51010 10.0.0.20190802
Manage pending time Activity field is added on the grid entry level under General tab of Manage pending time form. 55198 10.0.0.20190802
Invoice proposal When the invoice proposal is created specifying ‘Start date’ and ‘End date’ on Create invoice proposal form, same dates will get defaulted on the Invoice proposal header fields ‘Service date from’ and Service date to’. 43536 10.0.0.20190802

Version Information

Package Name Model Name Version
LearningPlan Learning Plan 10.0.0.20190802
PMIN Projects+ integrations 10.0.0.20190802
ProjAX ProjAX 10.0.0.20190802
ProjAXBI ProjAX BI 10.0.0.20190802
ProjAXIA ProjAX IA 10.0.0.20190802
ProjAXWorkspace ProjAXWorkspace 10.0.0.20190802


Version 10.0.0.20190724 | Hotfix Release | Jul 24, 2019.

Business scenario Description VSTS ID Version
Deferred revenue Fee journal with deferred revenue was getting posted with an error when ‘Accrued revenue sales value’ ledger is not defined. Now with this fix, user is restricted with an message stating ‘Accrued revenue sales value’ ledger is not defined. 52991 10.0.0.20190724
Deferred revenue Extra vouchers are created for the posted deferred revenue when same voucher series is defined for the fee journal in different legal entity. Now with this fix, no extra vouchers will be created for the posted deferred revenue when same voucher series is defined for the fee journal in different legal entity. 51599 10.0.0.20190724
Dimension Default Rule When the vendor invoice is created for intercompany timesheet in borrowing legal entity, Dimensions are defaulting from the borrowing legal entity instead of lending legal entity. Now with this fix Dimensions will default from lending company for the vendor invoice. 53520 10.0.0.20190724
Qualification data On the Project qualification view form Project ID, Project Title and Keywords fields was in smaller width. Now with this fix, filed width are extented. 52517 10.0.0.20190724
Work location Updated “Replacement key” parameter on PMIPWorklocation Table to “WorklocationIdIdx 51543 10.0.0.20190724
PSA Integration Project contract is not created in Dynamics F&O, if number sequence type is set as PSA in Projects+ integrations parameters. Now with this fix, Project contract will get created in Dynamics F&O with the number sequence type as PSA . 51397 10.0.0.20190724
PSA Integration Changing the project name in the PSA environment does not integrates into the Microsoft Dynamics 365 F&O. Now with this fix, Edited project name will get integrated into Microsoft Dynamics 365 F&O 51399 10.0.0.20190724
PSA integration Some of the customer information from PSA wasn’t getting integrated to Dynamics 365 F&O if the field service feature is not enabled. Now with this fix, all the customer information will get integrated to Dynamics 365 F&O if the field service feature is not enabled 51649 10.0.0.20190724
Projects+ parameter data entity Display balances and email template fields now added on the PSA parameters data entity. 52500 10.0.0.20190724
Manage pending time Added the appropriate security roles to the Edit timer form on manage pending time form. 53728 10.0.0.20190724
Manage pending time Activity lookup on manage pending form wasn’t allowing to select closed activity if the activity is closed in the current week. Now with this fix, Activity which is closed in current week can be selected on the manage pending time form. 44714 10.0.0.20190724
Timesheet line level Error was triggers when try to add Timesheet level line approval form onto the workspace. Now with this fix, Timesheet level line approval form can be added into workspaces without any errors . 40981 10.0.0.20190724

Resourcing enhancements and performance improvements


Parameter setup

On Projects+ parameter form, under resourcing tab, a new parameters has been introduced to control and enable new resource and project view form and to control and allow user to assign same resource more than one time in same project.


Fields Description
Enable new resource view Set ‘Enable new resource view’ field value to Yes in order to use new form for resource booking.
Enable new project view Set ‘Enable new project view’ field value to Yes in order to use new form for resource booking.
Book resource multiple times Set ‘Book resource multiple time’ field value to Yes in order book same resource more than one time in same project.

Enhancements in resource forecast form

1. Multiple resources – User can add same resource multiple times in a same project. This scenario is catered to handle scenarios where same resource is associated multiple times in same project for different period and resource is performing multi-role work in a same project.

2. Resource lookup – Resource lookup has been changed to include legal entity and role which makes the performance better. Lookup will now have the fields legal entity and role filters to search the resource from the lookup.

3. New field ‘Book hour per day’ – Initially hour per day value defaulted based on calendar associated in project. Once the resources are assigned to the resource forecast line, hour per day field value was getting updated based on calendar associated in resource. Now with this enhancement, ‘Book hour per day’ is made user key in field so that user can enter the value as required.

4. Estimate effort – Estimate effort field calculation will no longer be calculated based on start and end date. Estimate effort field is changed to user entry field where the user can enter value as required and search the resource from intelligent resource fulfillment from based on resource demand.

5. Changes to Intelligent resource fulfillment – Changed the logic to display the same resources, which is available to select for another line in same project. Now resource can be added multiple times in same project.


Resource View

New form called ‘Resource view’ added in resource forecast form to look up for all the resources who are associated in the selected project and booked hours against them.

The resource manager will be able to view all the resources and the work assigned to them in this form. The manager will be able to see both planned as well as named resource and book the hours against them from this form.

This form can be launched\opened from following places:

  • Project form
  • Resource forecast form
  • Resource, contractor, Employee forms. The view will be filtered for the selected resource record.
  • Resource view is available as a separate form under Projects+ > Project resources, where you will be able to see all resources and their project bookings.
  • Project management workspace
  • Project status workspace
  • Project tasks workspace (My Resource Assignment)
  • Resource management workspace
  • Setup Role form

Go to Project management and accounting > Projects > All projects > Resource forecast > Resource view button

This form comprises of three sections:
1. Left hand section – where all resources are listed out from the resource forecast demand. You can view

  • Name of the resource
  • Legal entity of the resource
  • Resource role

Right hand section* – This section is further divided into three tabs:

2. Header Section – This fast tab shows the header details of the selected resource.

  • Start date: Set the start date, to view the records in ‘Resource summary’ and ‘Resource booking entry’ for the selected date.
  • Format for the date range: Set the format date range to view 12-period bucket either in day, week or month view.
  • Show line with zero hours: Set Yes to show or No to hide the lines with zero hours in the resource booking tab
  • Show soft booking lines: Set Yes to show or No to hide the soft booking hours line in the resource booking tab.

3. Resource summary section – This fast tab will show the summary of the selected resource.

  • Hard booked – will display the sum of hard booked hours for the selected resource.
  • Soft booked – will display the sum of soft booked hours for the selected resource.
  • Target hours – will display the hours that are defined in the setup form of Target hour utilization.
  • Remaining – will display the remaining available capacity of the resource. This is the difference between booked and capacity.
  • 12 periods – depending on the view settings, whether the same is for 12 days, 12 weeks or 12 months.

4. Resource booking entry tab – This grid allows user to enter hours for resource booking, booking can be done for soft booking as well as hard booking.

  • Project id – displays the project id for the associated resource forecast record.
  • Project name – displays the project name for the associated resource forecast record.
  • Resource name – displays the name of the resource booked on this project and can switch to hard/soft booked/booking hours.
  • Booking Type – displays the booking type for the associated forecast record.
  • 12 periods – depending on the view settings, whether the same is for 12 days, 12 weeks or 12 months.

Project View

The project view form displays the booking or utilization of resources per project. The project manager/resource manager will be able to view all the resources assigned to the project. The manager will be able to see both planned resource bookings (e.g. Developer 1, Business analyst etc.) and named resource bookings in this form.

This form can be launched from:

  • Projects form.
  • Resource forecast form.
  • Project view is available as a separate from under Projects+ > Project resources, where you will be able to see all projects and the related resource bookings.
  • Project management workspace.
  • Project status workspaces.

Go to Project management and accounting > Projects > All Projects > Project resources > Project view

This form comprises of three sections:

1. Left hand section – Where all projects will be listed from the current legal entity.

2. Right hand section – This section is further divided into three tabs:

3. Header Section – This fast tab shows the header details of the selected Project.

  • Start date: Set the start date, to view the records in ‘Resource summary’ and ‘Resource booking entry’ for the selected date.
  • Format for the date range: Set the format date range to view 12-period bucket either in day, week or month view.
  • Show line with zero hours: Set Yes to show or No to hide the lines with zero hours in the resource booking tab
  • Show soft booking lines: Set Yes to show or No to hide the soft booking hours line in the resource booking tab.

4. Resource summary section – This fast tab will show the summary of the selected project.

  • Hard booked – will display the sum of hard booked hours for the selected project.
  • Soft booked – will display the sum of soft booked hours for the selected project.
  • 12 periods – depending on the view settings, whether the same is for 12 days, 12 weeks or 12 months.

5. Resource booking entry tab – This grid allows user to enter hours for resource booking, booking can be done for soft booking as well as hard booking.

  • Project name – displays the project name for the associated resource forecast record.
  • Legal entity – displays the legal entity of the resource
  • Role ID – displays the role ID, which is defined on the resource forecast.
  • Resource name- displays the name of the resource booked on this project and can switch to hard/soft booked/booking hours.
  • Booking Type – displays the booking type for the associated forecast record.
  • 12 periods – depending on the view settings, whether the same is for 12 days, 12 weeks or 12 months.

Version Information

Package Name Model Name Version
LearningPlan Learning Plan 10.0.0.20190724
PMIN Projects+ integrations 10.0.0.20190724
ProjAX ProjAX 10.0.0.20190724
ProjAXBI ProjAX BI 10.0.0.20190724
ProjAXIA ProjAX IA 10.0.0.20190724
ProjAXWorkspace ProjAXWorkspace 10.0.0.20190724


Version 10.0.0.20190614 | Hotfix Release | Jun 14, 2019.

Business scenario Description VSTS ID Version
Timesheets Missing timesheets are displayed for the resources who not employed for respective periods. Now with this fix, missing timesheets will be displayed only for the period where the resource is employed. 43216 10.0.0.20190614
Timesheet integration Category ID was not defaulting when the category in excel file was not defined while timesheet integration. Now with this fix, Category ID will be defaulted based on the activity, if not mentioned in the excel file while importing the timesheet records using the timesheet integration data entity. 44773 10.0.0.20190614
Timesheet integration Few ID fields on the timesheets integrated through PSA, has been changed on the timesheet grid. Project ID, Activity code and Resource ID fields were replaced with Project name, Activity name and Resource fields. 44769 10.0.0.20190614
Project categories On the Project categories form, we are able to attach same category created as Deferred item in ‘Posted revenue’ field.. Now with this fix, warning message is provided when try to attach same category. 44102 10.0.0.20190614
Project funding source data entity Added Email “To & CC”, Default invoice header text and Invoice format fields to data entity 48506 10.0.0.20190614
Personal time off request PMA validation was failing in PTO request form. Now Project /resource validation have been catered for PTO request form . 49978 10.0.0.20190614

Version Information

Package Name Model Name Version
LearningPlan Learning Plan 10.0.0.20190614
PMIN Projects+ integrations 10.0.0.20190614
ProjAX ProjAX 10.0.0.20190614
ProjAXBI ProjAX BI 10.0.0.20190614
ProjAXIA ProjAX IA 10.0.0.20190614
ProjAXWorkspace ProjAXWorkspace 10.0.0.20190614


Version 10.0.0.20190604 | Hotfix Release | Jun 04, 2019.

Business scenario Description VSTS ID Version
Workspaces Project ID hyper link not opening projects form for intercompany timesheet records on Global project administration workspace. Now with this fix Project ID hyper link opens respective project. 46870 10.0.0.20190604
Workspaces When Global project administrator tries to click on ‘Error workflow’ tile on Global project administration workspace error was triggering. Now this fix, workflow form gets opened without any error. 43861 10.0.0.20190604
Workspaces When Project accountant tries to Click on calculate button on Project statement opened through links on Project status workspace error was triggering. Now with this fix, no error triggers when try to calculate on Project statement. 43862 10.0.0.20190604
Workspaces On Project activities, Create time button was disabled for intercompany records on My project activities form . Now with this fix, Create button will be enabled. 48224 10.0.0.20190604
Workspaces On Global administration workspace, Reference number hyper link for vendor invoice was redirecting to the incorrect form. Now with this fix, it redirects to respective form . 45367 10.0.0.20190604
Timesheets Project Id hyperlink was redirecting to incorrect record for intercompany and non intercompany projects. Now with this fix, Project ID hyperlink opens respective project of respective entity. 44797 10.0.0.20190604
Auto add to favorites When the user assigns the resource on the WBS and publish it, automatically a favorite lines gets created on All favorites form. 44716 10.0.0.20190604
Auto add to favorites When the user deletes any task on the WBS and publish its, favorite record will get deleted on the All favorites form. 45169 10.0.0.201900604
Project invoice report Few fields on project invoice report was not getting translated according to the customer language. Now with this fix, all the fields will display with customer language . 45404
10.0.0.20190604
Project invoice report With the invoice grouping, Currency field was not getting displayed properly on the project invoice report in PDF format . Now with this fix, Currency field will be displayed properly in PDF format. 43745 10.0.0.20190604
Personal time off data entity Personal time off data entity is updated to import records based on the resource name and renamed User name to Resource with few validation. 43581, 43580 10.0.0.20190604
Timesheet integration For the imported inter-company timesheet lines, activity lookup used to display incorrect values. Now with this fix, Activity look for imported inter-company timesheet lines displays respective activities of the project. 44768 10.0.0.20190604

Version Information

Package Name Model Name Version
LearningPlan Learning Plan 10.0.0.20190604
PMIN Projects+ integrations 10.0.0.20190604
ProjAX ProjAX 10.0.0.20190604
ProjAXBI ProjAX BI 10.0.0.20190604
ProjAXIA ProjAX IA 10.0.0.20190604
ProjAXWorkspace ProjAXWorkspace 10.0.0.20190604


Version 10.0.0.20190509 | Hotfix Release | May 09, 2019.

Business scenario Description VSTS ID Version
Timesheet On the Timesheet line level approval form, Date on Timesheet lines and Day on Timesheet line comments was not matching. Now with this fix both Date and Day will match. 41184 10.0.0.20190509
Timesheet On the Timesheet line level approval form, Project ID hyperlink was not pointing to the right project. Now this fix, Project ID hyperlink will point to the right project for Intercompany and Non intercompany timesheets. 44797 10.0.0.20190509
Dimension Default Rule On Timesheet voucher entries, Financial dimensions on Payroll allocation ledger account used to default based on Default Dimension rule defined for Posting type Hours. Now with this fix, Payroll allocation ledger account voucher entry will use Default Dimension rule defined for Posting type Payroll allocation 38273 10.0.0.20190509
Workspaces On Project tasks workspace, When the user selects ‘My timesheets in all periods’ option and try to click the old dated timesheet number hyperlink, it was not pointing to the right timesheet number. Now with this fix, timesheet number hyperlink, it will point to the right timesheet number. 41154 10.0.0.20190509
Workspace On Global project administration workspace, When the user selects timesheet record and opens ‘Opens related transactions’, it was opening incorrect record. Now with this fix, it will open correct record. 43362 10.0.0.20190509
Business intelligence tool When the user executes Update utilization type, process to update utilization type transaction with date range, history records used to get deleted. Now with this fix, transactions will be recreated for a given date range. 43453 10.0.0.20190509
Business intelligence tool When user creates new record in Utilization type, error used to trigger and now with this fix no error message triggers. 43481 10.0.0.20190509

Version Information

Package Name Model Name Version
LearningPlan Learning Plan 10.0.0.20190509
PMIN Projects+ integrations 10.0.0.20190509
ProjAX ProjAX 10.0.0.20190509
ProjAXBI ProjAX BI 10.0.0.20190509
ProjAXIA ProjAX IA 10.0.0.20190509
ProjAXWorkspace ProjAXWorkspace 10.0.0.20190509


Version 10.0.0.20190412 | Hotfix Release | Apr 12, 2019.

Business scenario Description VSTS ID Version
Resourcing Users were allowed to select the legal entity which is not associated with intercompany relationship. Now with this fix user will be triggered with the message when try to select the legal entity 43455 10.0.0.20190412
Resourcing On the Resource view form, always logged in legal entity getting displayed for plan resource when the resource forecast line is created with other than logged in legal entity. Now with this fix legal entity selected on the resource fast line will be displayed on Resource view form 43477 10.0.0.20190412
Resourcing When user edits the FTE% as 50% for plan resource on resource forecasts form, FTE% was still showing as 100% for plan resource line on resource view form. Now with this fix, when the FTE% is edited on resource forecasts form same will get updated on resource line on resource view form 43478 10.0.0.20190412
Resourcing Refresh issue when the user books the time for closed period ,booked time was getting updated on hard and soft book column on resource view form 43474 10.0.0.20190412
Resourcing When try to split the line on resource forecast line error used to trigger. Now with this fix Split button will be enabled only after Resource forecast line gets saved 43471 10.0.0.20190412
Invoice grouping On the Invoice grouping report, Phone number as getting displayed on the report footer when the contact is saved for logged in legal entity on the legal entity setup. Now this is be not part of the Invoice grouping report 43857 10.0.0.20190412
Invoice grouping When the Project grouping checkbox is not marked and try to group the transactions based on the attributes, its was grouping the transaction with the combination of project and attribute. Now with this fix grouping of transaction will only be based on the attributes selected when the Project grouping checkbox is not marked 43767 10.0.0.20190412
Business intelligence tool Categories of all the transaction types were displayed in field ‘Category relation’ on Utilization type form. Now with this fix only categories related to Hour transaction type will be displayed on Utilization type form 43481 10.0.0.20190412
Rec ID enhancements On the posted transaction, Timesheet related transaction was not getting displayed when the intercompany timesheets were recorded. Now with this fix Timesheet related transaction will get displayed when the intercompany timesheets were recorded 43462 10.0.0.20190412
Dimension Inheritance On the Adjusted transaction, Dimensions were not picked based on the adjusted category/Activity. Now with this fix Dimensions are picked based on the edited attribute 43488 10.0.0.20190412
Dimension Inheritance Dimensions were getting defaulted from the Worker for Item transactions. Now with this fix if the source is defined as ‘Worker’ dimensions will not picked from the worker as user is not selecting any worker on Item transactions. Same is catered in Beginning balance journal 43489, 43490 10.0.0.20190412
Unit billing When the user runs ‘Create unit proposal’ batch for same date, Quantity getting wiped out from “Quantity update proposal” form and added validation on ‘Create unit proposal’ batch when Start date is greater than end date. Now with this fix Quantity will not get wiped off on “Quantity update proposal” form 43463, 43464 10.0.0.20190412
PTO Balances Imported PTO balance was displayed only on Project task workspace. Now with this fix PTO balance will be available on Personal time off request form, My resource PTO request form, My employee PTO balance list on Resource management workspace 43574 10.0.0.20190412
Personal Time Off Project ID look up field was displaying all the projects on Personal time off request form irrespective of PTO parameter marked or unmarked on the attached project group. Now only project with PTO parameter marked on attached project group will be displayed in Project ID look up of Personal time off request form 43573 10.0.0.20190412
Manage pending time User was allowed to create timesheet from manage pending time even if Block future timesheet entries standard parameter is marked. Now with this fix users are blocked create timesheet from manage pending when Block future timesheet entries standard parameter is marked 39681 10.0.0.20190412
Manage pending time User was allowed to update hours more than the maximum working hours on manage pending time when the standard setup ‘Max hours calendar’ was set on resource. Now with this fix message will be triggers when try to update more than the maximum working hours manage pending time 40029 10.0.0.20190412
Manage pending time Incorrect message used to trigger when user transfer time line to timesheet using transfer to timesheet button with Zero hour. Now with this fix warning message is triggered and user is stopped to transfer time line to timesheet 40077 10.0.0.20190412
Manage pending time When the calendar is imported for the first time from outlook, all the records were displayed with timer running. Now with this fix, calendar will imported correctly 43670 10.0.0.20190412
Manage pending time Activity description was missing for intercompany projects in the tree on manage pending time form. Now with this fix Activity description will be displayed for intercompany projects 43672 10.0.0.20190412
Manage pending time When the assign line to favourites is performed on manage pending time, the focus always on the parent node. Now with this fix, focus will be on the newly created node 43783 10.0.0.20190412
Manage pending time Timer was allowed to run on the older date. Now with this fix, Timer button is disabled when the timesheet date is less than current date 43711 10.0.0.20190412
Manage pending time Time summary bar chart was showing wrong information for split periods. Now with this fix, Time summary bar chart will show for 7 days from the timesheet day start parameter 43711 10.0.0.20190412
Manage pending time While creating a record for intercompany project, Project management and accounting validations for project/category, resource/project, category/resource defined on logged in legal entity were restricting the time entry. This issue is addressed by validating the parameters defined on the legal entity for project selected on the manage pending time entry form 43825 10.0.0.20190412
Qualification view Auto update to qualification data field was not getting refreshed even after making parameter on. Now with this fix after marking parameter marked, it doesn’t get unmarked 43562 10.0.0.20190412
Chat on teams integration ‘Chat with resource’ button was disabled on Personal time off request line in Draft status on Personal time off request enquiry form and ‘Chat with time approver’ button was enabled from Personal time off form for Draft status. Now the button is enabled on Personal time off request enquiry form and disabled on Personal time off form for Draft status 43590, 43589 10.0.0.20190412

Version Information

Package Name Model Name Version
LearningPlan Learning Plan 10.0.0.20190412
PMIN Projects+ integrations 10.0.0.20190412
ProjAX ProjAX 10.0.0.20190412
ProjAXBI ProjAX BI 10.0.0.20190412
ProjAXIA ProjAX IA 10.0.0.20190329
ProjAXWorkspace ProjAXWorkspace 10.0.0.20190412


Version 10.0.0.20190329 | Major Release | Mar 29, 2019

Business scenario Description VSTS ID Version
Resourcing Addressed an issue where Resource lines getting deleted from the resource forecast form if user trying to assign resource for default role from the Intelligent resource fulfilment form. 43456 10.0.0.20190329
Resourcing Addressed an issue where Resource still exist to assign on the project if that resource already assigned to the default role line using Intelligent resource fulfilment form 43457 10.0.0.20190329
Resourcing Addressed an issue where Resource getting displayed in the “Intelligent resource fulfilment” form with zero available hour, It denote resource does not have available capacity to booked on any project 43469 10.0.0.20190329
Resourcing Addressed an issue where When user modifies the estimated effort value and refreshing the form using standard refresh button, Estimate effort is reverting back with original value 43472 10.0.0.20190329
Invoice grouping On the Invoice proposal form, grouping was not happening by Expense report ID and Item sales tax group. Grouping by these fields is now available 43065 10.0.0.20190329

Version Information

Package Name Model Name Version
LearningPlan Learning Plan 10.0.0.20190329
PMIN Projects+ integrations 10.0.0.20190329
ProjAX ProjAX 10.0.0.20190329
ProjAXBI ProjAX BI 10.0.0.20190329
ProjAXIA ProjAX IA 10.0.0.20190329
ProjAXWorkspace ProjAXWorkspace 10.0.0.20190329

Feedback

Was this helpful?

Yes No
You indicated this topic was not helpful to you ...
Could you please leave a comment telling us why? Thank you!
Thanks for your feedback.

Post your comment on this topic.